Transmission & interconnection strategy
Site and POI screening, grid-capacity assessment, project sizing, and regional process strategy across CAISO/WECC, MISO, PJM, ERCOT, and regulated utility systems.
Fred Raddatz, PE
Licensed Professional Engineer with 17+ years across electric utilities and renewable-energy development, including 14+ years in transmission planning and generation interconnection. I connect detailed power-system analysis with grid strategy, process fluency, and decision-ready recommendations.
Professional overview

I work at the point where power-system analysis becomes a project decision.
My experience spans utility-side transmission reinforcement and generation interconnection, as well as developer-side interconnection, siting, diligence, and grid strategy for utility-scale solar, standalone battery storage, and hybrid resources.
I independently define ambiguous technical problems, determine the analysis and engagement required, test the assumptions that matter, and translate study, upgrade, agreement, schedule, and commercial implications into clear options and recommendations.
CAISO/WECC · MISO · PJM · ERCOT · Regulated utility systems
Areas of expertise
Focused on the questions that determine whether an infrastructure opportunity is viable, how it should advance, and what risks must be managed.
Site and POI screening, grid-capacity assessment, project sizing, and regional process strategy across CAISO/WECC, MISO, PJM, ERCOT, and regulated utility systems.
Steady-state, contingency, deliverability, transfer-limit, charging, and related analyses with independent review of models, assumptions, results, and upgrade drivers.
Technical and commercial evaluation of transmission constraints, network-upgrade exposure, cost allocation, schedule, and long-range system changes.
Applications, studies, modifications, agreements, securities, milestones, restudies, and cross-functional coordination through critical project decisions.
Interconnection-focused M&A diligence, transaction support, project prioritization, and clear recommendations grounded in technical, schedule, and commercial risk.
In-house study capability, repeatable methods, engineering controls, work-product review, mentoring, and carefully governed AI-assisted workflows.
Career experience
A career built across both sides of interconnection, with a foundation in utility planning and a current focus on developer-side grid strategy and technical decision support.
Hanwha Group
Lead transmission planning, interconnection, and grid-capacity strategy for utility-scale solar, standalone BESS, and hybrid resources. Guide site and POI selection, project sizing, study scope, interconnection approach, and proceed, modify, or withdraw recommendations.
Senior Engineer, Transmission Planning - Generation Interconnection
Analyzed generation interconnection requests and produced reliability-study reports under CAISO, FERC, NERC, and SDG&E requirements. Coordinated with CAISO, customers, consultants, and internal teams on new requests, modifications, Rule 21, and wholesale distribution studies.
Applied and reviewed power-flow, contingency, short-circuit, voltage, and stability work, while developing reusable automation that improved case preparation, analysis, and reporting.
An Exelon Company
Progressed from distribution design into transmission reinforcement planning. Developed and supported more than 40 transmission projects under FERC, NERC, PJM, and ComEd requirements, addressing capacity, reliability, generation changes, and large-customer load additions.
Evaluated system needs and alternatives, prepared technical justifications, and presented recommendations to vice president approval committees.
Selected professional impact
Public-safe examples of how engineering analysis, process judgment, and cross-functional leadership have supported infrastructure and investment choices.
Compared site, POI, capacity, queue, dispatch, and project-sizing alternatives to support prioritization and proceed, modify, or withdraw decisions.
Translated study results, upgrades, cost allocation, schedules, agreements, and regulatory dependencies into decision-ready project recommendations.
Developed and supported more than 40 ComEd transmission reinforcement projects, including alternatives, technical justifications, and recommendations for executive authorization.
Helped establish in-house study methods, QA controls, documentation, repeatable workflows, and mentoring that strengthened engineering quality and consistency.
Cross-functional support spanning development, legal, finance, commercial, M&A, consultants, utilities, transmission providers, and executive teams.
How I work
The goal is not more analysis. It is the right analysis, with clear assumptions, meaningful alternatives, and engineering judgment retained throughout.
Start with the action the analysis must inform, not with an assumed study task.
Set defensible assumptions, source traceability, study scope, and validation controls.
Test scenarios and sensitivities so the recommendation is not anchored to one isolated result.
Connect technical findings to cost, schedule, deliverability, agreements, and project viability.
Present clear options, tradeoffs, and a defensible path forward for the decision-makers involved.
Professional leadership & credentials
Connect
I welcome professional conversations about transmission planning, generation interconnection, grid strategy, utility infrastructure, and technical leadership.